The demolition work has begun. The buildings of the former Kellerei Bozen are currently being stripped out, as cables, metal, bricks, wood, insulation, etc., are being separated and taken to the landfill. The remaining masonry will then be demolished at the beginning of May 2026, after which excavation of the construction pit for a 2-level garage can begin.”

