In the rear section of the residential building, the foundation level has almost been fully reached. The construction vehicle ramp has now been extended down to the same level. Shotcrete works are now progressing to the front area for the driveway and hotel garage. Next week, the last above-ground structures of the former wine cellar will be demolished.


Italiano

.

Call Now Button