Excavation works in the rear area have reached the foundation level (two underground floors). In the area of the former wine cellar, the curve of the garage ramp is now visible on the right-hand side. Stabilisation works and excavations are now continuing in the front section in order to reach the foundation level there as well


Italiano

.

Call Now Button