Work is picking up pace: formwork is being installed and the steel reinforcement for the first elevator shaft is being placed. At the hotel, the soil can now be excavated down to the basement, which is to be retained.

Work is picking up pace: formwork is being installed and the steel reinforcement for the first elevator shaft is being placed. At the hotel, the soil can now be excavated down to the basement, which is to be retained.